Sustrans Connect2

sustrans_logo

LATEST NEWS for information on the Shrewsbury Northern Gateway Enhancement Scheme, click here.

Shrewsbury is one of 79 places across the UK which has been chosen to receive Connect2 funding from Sustrans, the sustainable transport charity. 

To find out about the other Connect2 schemes across the UK visit the Sustrans Connect2 website.

Lottery FundedWhat is Connect2?

Sustrans' Connect2 is funded by a 50 million Big Lottery Fund grant after the UK public voted the scheme the winner of The People's Millions Lottery contest in December 2007.

Shrewsbury is also one of 18 cycling towns in England. Connect2 in Shrewsbury is managed as part of Cycle Shrewsbury.

What areas will benefit from the Connect2 scheme?

The focus of Connect2 in Shrewsbury will be a riverside promenade along Smithfield Road and a pedestrian/cycle crossing at Welsh Bridge, linking the traffic-free route through the Quarry to the bus and railway stations. It will also make it easier to visit the Darwin Geo-garden which has been created to mark the 200th anniversary of Charles Darwin's birth.

The Connect2 network continues to the railway station and the north of the town, as well as connecting to National Cycle Route 81 alongside the River Severn. 

Download a PDF map of the proposed scheme

How will Connect2 be delivered?

The Sustrans Connect2 funding is available until 2013. In Shrewsbury Connect 2 is managed as part of Cycle Shrewsbury, which runs until 2011, and the aim is to deliver all the Connect2 improvements during the lifetime of Cycle Shrewsbury. Download maps and photos of completed schemes here.

 

The Cycle Shrewsbury/Connect 2 Project Group has members drawn from local cycling and walking groups, health organisations, Sustrans, disability groups, local cycle trade, Shrewsbury Town Council and the Shrewsbury and Newport Canal Trust, as well as relevant departments of Shropshire Council including planning, economic development and sustainability. Shropshire councillors are also represented. The group meets approximately quarterly and oversees progress in all areas of the programme.

 

You can contact the Steering Group using the contact details on this page.

 

Connect2 projects

The following elements all form part of Shrewsbury's 'core' network of Connect2 walking and cycling routes, to be completed by 2012:

  • Element 1 - Greenfields Greenways - completed July 2009. Find out more here.
  • Element 2 - Welsh Bridge - opened April 2010. Find out more here.
  • Element 3 - Ellesmere Grange - opened December 2009. A new ellesmere_grange_cycle_pathtraffic-free path and cycle track now connects Castle Foregate with Ellesmere Road, via the new Ellesmere Grange housing development.
  • Element 4 - Castle Foregate crossing. Following the opening of the Ellesmere Grange path, we carried out surveys in May and June 2010 to assess demand and identify the best location for crossing facilities on Castle Foregate. The current plan is to provide better crossings as part of Element 6

  • Element 5 - Smithfield Road/ Raven Meadows -Improvements were completed in November 2011 and include; new crossing facilities and junction improvements at Raven Meadows; shared use footway between Roushill and Meadow Place; pedestrian/cyclist refuge near Roushill; and a cycle contra flow lane on Meadow Place. Download a map of this route.
    Raven Meadows/ Smithfield Road junction improvements - Find out more here.
  • Element 6 Northern Gateway Enhancement Scheme consultation is now taking place on key proposals for the Shrewsbury Station area and Chester Street gyratory.  Findout more here.Castle Gates/Foregate - due 2012. Modelling work has been completed for improvements to the gyratory system on Chester Street, Castle Foregate, Cross Street and Smithfield Road. A number of design options are now being reviewed. Find out more here.
  • Element 7 - Greenfields streets - due 2012. Design work is due to start soon on options to link the new Ellesmere Grange path to the Greenfields Greenways. Signing was completed in August 2010. Find out more here.

Route user surveys

In October 2010 Sustrans carried out route user surveys at Welsh Bridge and Castle Foregate. Follw the links below to download the reports of these surveys:

Contact details:

Connect2
Transport Planning
Shropshire Council
Shirehall
Shrewsbury
SY2 6ND

Tel: 01743 255435
E-mail: [email protected]

What's on

02/09/2012

Women on wheels social ride

09/09/2012

Cycling with Tots - information and try out session

23/09/2012

West Midlands Cyclo Cross league 2

25/09/2012

Shropshire Cycle Forum

28/09/2012

Basic cycle maintenance course

 
 


Web Design Shrewsbury by Source